Kansas Government Contractors > Pars Consulting Engineers, Inc.
Pars Consulting Engineers, Inc.Leawood, Kansas
913-432-0107 x109
14109 Cambridge Lane
Leawood, KS 66224-7500
Fax:913-432-5708
Products & Services
Pars Consulting Engineers, Inc. is organized and equipped to provide, multi-disciplinary approaches and qualified technical expertise to the solution of wide variety of problems which may arise in business, industry, and government.
All Type of software and hardware to finish a project
Keywords
- Engineering Services
- Surveying
- Highway
- Electrical Engineers
- Construction Mgmt
- Drafting
NAICS Code(s)
- 236118
- Residential Remodelers
- 236210
- Industrial Building Construction
- 236220
- Commercial and Institutional Building Construction
- 237110
- Water and Sewer Line and Related Structures Construction
- 237120
- Oil and Gas Pipeline and Related Structures Construction
- 237130
- Power and Communication Line and Related Structures Construction
- 237310
- Highway, Street, and Bridge Construction
- 237990
- Other Heavy and Civil Engineering Construction
- 335129
- Other Lighting Equipment Manufacturing
- 335313
- Switchgear and Switchboard Apparatus Manufacturing
- 335999
- All Other Miscellaneous Electrical Equipment and Component Manufacturing
- 532299
- All Other Consumer Goods Rental
- 541219
- Other Accounting Services
- 541310
- Architectural Services
- 541320
- Landscape Architectural Services
- 541330
- Engineering Services
- 541340
- Drafting Services
- 541350
- Building Inspection Services
- 541360
- Geophysical Surveying and Mapping Services
- 541370
- Surveying and Mapping (except Geophysical) Services
- 541380
- Testing Laboratories
- 541410
- Interior Design Services
- 541420
- Industrial Design Services
- 541430
- Graphic Design Services
- 541490
- Other Specialized Design Services
- 541511
- Custom Computer Programming Services
- 541512
- Computer Systems Design Services
- 541513
- Computer Facilities Management Services
- 541519
- Other Computer Related Services
- 541611
- Administrative Management and General Management Consulting Services
- 541614
- Process, Physical Distribution, and Logistics Consulting Services
- 541618
- Other Management Consulting Services
- 541620
- Environmental Consulting Services
- 541690
- Other Scientific and Technical Consulting Services
Contracts
Name: | Colburn Road Phase 2 |
---|---|
Contract: | 2411 |
Start: | 09/01/2006 |
End: | 12/15/2006 |
Value: | 366,995.00 |
Contact: | Dr Ali Roohanirad- director of public works kcmo |
Phone: | 816-881-4447 |
Name: | Colburn Road Phase 3 |
---|---|
Contract: | 2455 |
Start: | 07/15/2002 |
End: | 01/08/2004 |
Value: | 443,829.00 |
Contact: | Larry Knudsen |
Phone: | 913-438-8646 |
Name: | Harry S Truman Drive |
---|---|
Contract: | 200219 |
Start: | 12/31/2003 |
End: | 09/06/2005 |
Value: | 196,850.00 |
Contact: | JD Stokes-director of public works |
Phone: | 816-881-4447 |
Name: | kcmo street design project-raphael construction |
---|---|
Contract: | 200201 |
Start: | 07/19/2002 |
End: | 11/20/2002 |
Value: | 40,650.00 |
Contact: | Mark Curfman |
Phone: | 816-842-2444 |
Name: | KDOT-construction staking |
---|---|
Contract: | 52c3604-01 |
Start: | 04/17/2000 |
End: | 07/17/2000 |
Value: | 10,525.00 |
Contact: | king construction co.- |
Phone: | 785-863-2534 |
Name: | Catch Basin- kcmo water dept.. |
---|---|
Contract: | 074 |
Start: | 11/05/2004 |
End: | 02/05/2004 |
Value: | 79,920.00 |
Contact: | Franklyn Pogge |
Phone: | 816-513-0271 |
Name: | Blue Ridge Blvd and 87th st |
---|---|
Contract: | 04252 |
Start: | 02/03/2005 |
End: | 05/03/2005 |
Value: | 11,870.00 |
Contact: | Lu Larson |
Phone: | 816-513-2720 |
Name: | Intersection improvement of Gregory and Troost |
---|---|
Contract: | 4372 |
Start: | 10/07/2004 |
End: | 06/07/2005 |
Value: | 71,391.00 |
Contact: | Chris Chiodini |
Phone: | 816-822-4286 |
Name: | Traffic Signal Modification Troost and 31st-kcmo |
---|---|
Contract: | 200239-89004456 |
Start: | 03/01/2006 |
End: | 06/01/2006 |
Value: | 32,910.00 |
Contact: | Server Sheriff-project manager |
Phone: | 816-513-2720 |
Name: | Riverfront Heritage Trail Phase1 Part2 |
---|---|
Contract: | 2785 |
Start: | 08/09/2001 |
End: | 02/23/2007 |
Value: | 52,482.00 |
Contact: | Glen LeRoy |
Phone: |
Name: | KCMO CBD Signal Interconnect Project-Olsson Associates |
---|---|
Contract: | 2000-0721 |
Start: | 02/28/2002 |
End: | 10/22/2008 |
Value: | 41,440.00 |
Contact: | Michael McKenna P.E.-senior project engineer |
Phone: | 816-361-1177 |
Name: | Blue Ridge Pump Station Switchgear Modifications |
---|---|
Contract: | 7132 |
Start: | 09/25/1997 |
End: | 12/13/1997 |
Value: | 31,600 |
Contact: | Gurnie Gunter- director water services department |
Phone: |
Name: | Blue River Hills Site Development |
---|---|
Contract: | 111105 |
Start: | 11/21/2005 |
End: | 02/21/2006 |
Value: | 235,000.00 |
Contact: | W Robert Comp jr |
Phone: | 417-849-2473 |
Name: | First Babtist Church of Raymore-traffic impact study |
---|---|
Contract: | 200301 |
Start: | 02/17/2003 |
End: | 03/17/2003 |
Value: | 3,570.00 |
Contact: | Eric Wierman- construction project manager |
Phone: |
Name: | Signal System for Central Business District Phase 2 |
---|---|
Contract: | 2000-0712 |
Start: | 11/05/2003 |
End: | 01/23/2004 |
Value: | 18,100.00 |
Contact: | Mike McKenna |
Phone: |
Name: | 31st st bridge replacement over Wyandotte |
---|---|
Contract: | 007-2042 |
Start: | 02/01/2008 |
End: | 12/31/2008 |
Value: | 23,530.00 |
Contact: | Curt Madder |
Phone: |
Name: | 12th and Kentucky |
---|---|
Contract: | 10294 |
Start: | 08/25/2004 |
End: | 11/25/2004 |
Value: | 31,240.00 |
Contact: | Ed Bollin |
Phone: | 913-577-8339 |
Name: | Little Blue River-Lumpkins Fork-White Oak Watershed |
---|---|
Contract: | 200217-kcmo 046 |
Start: | 12/17/2002 |
End: | 03/17/2002 |
Value: | 121,516.00 |
Contact: | Leslie Barnt-GBA |
Phone: | 913-492-0400 |
Name: | Little Shoal Creek Watershed-Round Grove Watershed |
---|---|
Contract: | 10.14 |
Start: | 10/24/2000 |
End: | 01/24/2001 |
Value: | 20,640.00 |
Contact: | J. Thad May |
Phone: | 816-492-0400 |
Name: | 97th and Eastern Ave Collection System |
---|---|
Contract: | 200208 |
Start: | 08/05/2002 |
End: | 11/05/2002 |
Value: | 36,000.00 |
Contact: | Kevin Waldon |
Phone: | 913-492-0400 |
Name: | Colbern Road Phase 4 |
---|---|
Contract: | 200220-2487 |
Start: | 12/31/2003 |
End: | 07/08/2005 |
Value: | 700,720.00 |
Contact: | |
Phone: |
Name: | 39th and Prospect Signal #2 |
---|---|
Contract: | 980272 |
Start: | 06/15/1998 |
End: | 09/15/1998 |
Value: | 9035.00 |
Contact: | Mohsin Zaidi P.E. |
Phone: |
Name: | Noland Road Bridge |
---|---|
Contract: | 200210-2390 |
Start: | 02/23/2005 |
End: | 05/23/2005 |
Value: | 28,125.00 |
Contact: | JD Stokes |
Phone: | 816-881-4447 |
Name: | Norby Gardens-QuadCo Resources llc |
---|---|
Contract: | 091405 |
Start: | 09/28/2005 |
End: | 07/28/2006 |
Value: | 62,600.00 |
Contact: | Wylie Comp |
Phone: | 913-268-8877 |
Name: | Southern Ozarks Development co llc-Drainage study |
---|---|
Contract: | cc0h65 |
Start: | 10/30/2006 |
End: | 11/17/2006 |
Value: | 2710.25 |
Contact: | Larry Ross-project manager W.A. Ellis construction |
Phone: | 816-257-2300 |
Name: | ltd2-Barry Rd&Barrybrook Drive |
---|---|
Contract: | 2390 |
Start: | 01/24/2008 |
End: | 04/24/2008 |
Value: | 23,525.00 |
Contact: | Stan Eiler- P.E. |
Phone: | 816-891-2523 |
Name: | KDOT |
---|---|
Contract: | 32-52K7388-01 |
Start: | 07/29/2004 |
End: | 10/29/2004 |
Value: | 9,373.79 |
Contact: | Sandra Greenwell-external eeo officer |
Phone: | 785-296-7940 |
Name: | Mega Industries Corp. |
---|---|
Contract: | 321 |
Start: | 05/31/2004 |
End: | 07/09/2004 |
Value: | 7,750.00 |
Contact: | Kathie-Mega Industries |
Phone: | 816-472-8722 |
Name: | Talialferro&Brown inc. |
---|---|
Contract: | 72-0652 |
Start: | 08/16/2004 |
End: | 10/06/2004 |
Value: | 7,760.00 |
Contact: | Leonard Graham-president |
Phone: | 816-283-3456 |
Name: | Karbank Development Co.-112th st Traffic Impact Study |
---|---|
Contract: | 06203 |
Start: | 03/21/2003 |
End: | 08/07/2003 |
Value: | 6,200.00 |
Contact: | Steve Karbank CEO |
Phone: | 816-221-4488 |
Name: | Jackson County Missouri--RD Mize road between Little Blue Pkwy and Eureka |
---|---|
Contract: | 200420 Jackson co#30 |
Start: | 06/25/2004 |
End: | |
Value: | 300,000.00 |
Contact: | Scott Green |
Phone: | 816-881-4530 |
Name: | Jackson County Missouri-39th st from Noland to Crysler Ave |
---|---|
Contract: | 200320--J co#3036 |
Start: | 05/04/2005 |
End: | |
Value: | 249,911.00 |
Contact: | Scott Green |
Phone: | 816-881-4530 |
Name: | Jackson County Missouri-85th st and Troost Bridge Phase 1 |
---|---|
Contract: | 200614--ja co #2407 |
Start: | 08/16/2006 |
End: | |
Value: | 547,371.00 |
Contact: | Glen Devo |
Phone: | 816-881-4530 |
Name: | BWR-Maplewoods Pkwy Phase2b- subcontract |
---|---|
Contract: | 2009-0064--70078806 |
Start: | 02/13/2009 |
End: | 12/13/2009 |
Value: | 30,000.00 |
Contact: | Steven Hileman- Bucher,Willis&Ratliff Corp. |
Phone: | 816-363-2696 |
Name: | Hunt Midwest Agreement1 N Oak Village E Property LIne Wall |
---|---|
Contract: | Agreement 1 Sup 1 |
Start: | 03/08/2007 |
End: | 04/08/2007 |
Value: | 14,895.00 |
Contact: | Beau Groceman |
Phone: |
Name: | Design Professional and Land Surveying Kansas City MO |
---|---|
Contract: | 0000006298 |
Start: | 01/30/2007 |
End: | 04/30/2007 |
Value: | 107,000.01 |
Contact: | Ralph Davis-Project Mgr. |
Phone: | 816-513-2740 |
Name: | Hunt Midwest-North Oak Village Modular Retaining Wall |
---|---|
Contract: | Agreement No 1 |
Start: | 01/16/2007 |
End: | 03/31/2007 |
Value: | 38,100 |
Contact: | Beau Groceman |
Phone: |
Name: | Spring Valley Park Lake Restoration-KC parks and rec |
---|---|
Contract: | 200715Pars_70054924P |
Start: | 04/06/2007 |
End: | 04/30/2009 |
Value: | 69,000 |
Contact: | Abe Shirazi |
Phone: | 816-513-7624 |
Name: | Olsson Associates-subcontract 12th st Viaduct Bridge over Railroad Phase3 |
---|---|
Contract: | 89005442KCMO-0090205 |
Start: | 03/27/2009 |
End: | 12/31/2009 |
Value: | 120,520 |
Contact: | Curt H Mader/Pat Ward-Team Leaders |
Phone: | 913-829-0078 |
Name: | Platte Purchase Ball Fields Lighting-1 |
---|---|
Contract: | 70084027 |
Start: | 04/27/2009 |
End: | 07/06/2009 |
Value: | 14,680 |
Contact: | Abe Shirazi-project manager |
Phone: | 816-513-7614 |
Name: | General Services Administration-Exterior Shell Maintenance |
---|---|
Contract: | GS-06P-09-TE-P-0026 |
Start: | 04/01/2009 |
End: | 04/30/2009 |
Value: | 99,899.00 |
Contact: | Ms Judy Reeves |
Phone: | 816-823-1706 |
Name: | General Services Administration - Lightning Protection System |
---|---|
Contract: | GS-06P-TE-P-0010 |
Start: | 02/05/2008 |
End: | 06/15/2008 |
Value: | 70,467.00 |
Contact: | Mr. Harold Porter |
Phone: | 816-823-1677 |
Name: | National Institutes of Health - Electrical Engineering Study |
---|---|
Contract: | HHSN292200700008C |
Start: | 09/28/2007 |
End: | |
Value: | $2,699,974.00 |
Contact: | Ms. Jamie Natour |
Phone: | 301-594-6069 |
Name: | Wornall Construction Mangment, KCMO |
---|---|
Contract: | CS 110064 |
Start: | 01/31/2011 |
End: | 11/21/2011 |
Value: | 102,040.0 |
Contact: | James K. Townsend |
Phone: | 816-701-3108 |
Found any discrepancies in your company profile?
Company Information
- Company Name:
- Pars Consulting Engineers, Inc.
- Address:
- 14109 Cambridge Lane
- City:
- Leawood
- State:
- Kansas
- Zip Code:
- 66224-7500
- Phone:
- 913-432-0107 x109
- Fax:
- 913-432-5708
- Contact Person:
- RAFIE Hamidpour
- Legal Structure:
- Subchapter S Corporation
- Year Established:
- 1995
- Business Type:
- Construction (20 %)
- Service (80 %)
- Certification Type:
- 8(a), Small Disadvantaged Business,
- Sales/Service Area:
- Aruba; Antigua and Barbuda; Algeria; Azerbaijan; Albania; Armenia; Argentina; Australia; Austria; Anguilla; Bahrain; Barbados; Botswana; Bermuda; Belgium; Bahamas, The; Bangladesh; Belize; Bosnia and Herzegovina; Bolivia; Benin; Belarus; Solomon Islands;
- Ownership:
- Community Development Corporation Owned Firm
- Other Minority Owned
- Self-Certified Small Disadvantaged Business
- Subcontinent Asian American