Agency: |
County of Johnson |
Level of Government: |
State & Local |
Category: |
- Y - Construction of Structures and Facilities
|
Opps ID: |
NBD18090114398972713 |
Posted Date: |
Dec 22, 2022 |
Due Date: |
|
Solicitation No: |
2022-074 Addendum 1 |
Bid Information
Type
|
Invitation for Bid
|
Status
|
Unsealed
|
Number
|
2022-074 Addendum 1 (Transit Paving Improvements Phase V)
|
Issue Date & Time
|
12/5/2022 04:39:53 PM (CT)
|
Close Date & Time
|
12/22/2022 02:00:00 PM (CT)
|
Duration
|
16 days 21 hours 20 minutes 6 seconds
|
Notes
|
A MANDATORY Pre-Bid Conference and Site Visit will be held on December 12, 2022, at 1:00 PM at the Johnson County Murry L. Nolte Transit Center located at 1701 W. 56 Highway, Olathe, Kansas 66061. Please gather at the front entrance. Bidders are required to attend the meeting to view site conditions.
All bids must be submitted through Johnson County's electronic bidding system, IonWave.
|
Contact Information
Name
|
Santos Madrigal
|
Address
|
111 S. Cherry, #2400
Olathe, KS 66061 USA
|
Phone
|
(913) 715-0538
|
Fax
|
|
Email
|
santos.madrigal@jocogov.org
|
|
Bid Questions
Question
|
Is 9” gravel to be used under the whole pavement section?
|
Answer
|
Yes, 9” KDOT AB-1 will be used under all proposed concrete pavement. See typical section Sheet C14.
|
Submitted
|
12/15/2022 08:53:19 AM (CT)
|
|
|
Question
|
Will the bollards by the fuel pumps be replaced?
|
Answer
|
Bollards are to be re-used. They will be removed and reset by the Contractor. Please see Addendum 1 for revised drawings.
|
Submitted
|
12/15/2022 08:52:56 AM (CT)
|
|
|
Question
|
What is the underdrain pipe material?
|
Answer
|
Underdrain pipe material is called out on plans, pg C14.
|
Submitted
|
12/15/2022 08:51:54 AM (CT)
|
|
|
Question
|
Is high early strength concrete going to be used?
|
Answer
|
Yes, KCMMB 5K High Early strength concrete will be used for the base bid as well as alternate bid #2. It will not be used for alternate bid #1.
|
Submitted
|
12/15/2022 08:51:18 AM (CT)
|
|
|
Question
|
How much rock does the base bid paving get and does it get geogrid? Is there a cross section available for the base bid and alternate 1?
|
Answer
|
Base bid gets the filter fabric, 9" of KDOT AB-1 and Tensar Geogrid. The cross section is shown on C14, less the underdrain. Same section is used for Alternate #1 excluding the underdrain. See Addendum 1 for revised drawings.
|
Submitted
|
12/13/2022 10:54:26 AM (CT)
|
|
|
Question
|
Does the base bid paving get underdrain?
|
Answer
|
No base bid does not get underdrain.
|
Submitted
|
12/13/2022 10:52:37 AM (CT)
|
|
|
Bid Event Participation Activity
|
Activity Date
|
Activity Name
|
Description
|
|
12/12/2022 01:00:00 PM (CT)
|
MANDATORY Pre-Bid Conference / Site Visit
|
A MANDATORY Pre-Bid Conference and Site Visit will be held on December 12, 2022, at 1:00 PM at the Johnson County Murry L. Nolte Transit Center located at 1701 W. 56 Highway, Olathe, Kansas 66061. Please gather at the front entrance. Bidders are required to attend the meeting to view site conditions.
|
|
12/22/2022 02:00:00 PM (CT)
|
Zoom Bid Opening
|
Join Zoom Meeting
https://zoom.us/j/98680357321
Meeting ID: 986 8035 7321
One tap mobile
+17193594580,,98680357321# US
+12532050468,,98680357321# US
|
Bid Event Non-Participation Activity
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.
Start Free Trial Today >